Orange S-Curved Chenille Sectional Sofa with Dual-Depth.

Orange S-Curved 2-Seat Chenille Sectional Sofa with Flared Arms

$341.42
Skip to product information
Orange S-Curved Chenille Sectional Sofa with Dual-Depth.

Orange S-Curved 2-Seat Chenille Sectional Sofa with Flared Arms

New Arrivals

$341.42
FREE SHIPPING

0 people viewing this product

Enhance your living space with this stylish orange S-curved sectional sofa, featuring premium chenille fabric and a comfortable medium-soft foam fill. Its unique American-inspired design with elegant flared arms provides a cozy, sophisticated look perfect for any bedroom or small lounge area. Discover the perfect blend of modern flair and everyday comfort for your home today.

Material: Chenille
Color: Orange
Seats: 2
Assembly Required: Yes
Height: 32 inches
Width: 65 inches
Depth: 30 inches
Product Weight: 85 lbs
Max Weight Capacity: 500 lbs

10 left

Need assistance? Call us.

Estimated Delivery:

Arrives by, {earliest_date} - {latest_date}

✓ Free Standard Shipping

✓ Ships from U.S.

✓ Damage-Free Delivery Guarantee

✓ Support Available Before & After Delivery

✓ 14-Day Returns

Details

Enhance your living space with this stylish orange S-curved sectional sofa, featuring premium chenille fabric and a comfortable medium-soft foam fill. Its unique American-inspired design with elegant flared arms provides a cozy, sophisticated look perfect for any bedroom or small lounge area. Discover the perfect blend of modern flair and everyday comfort for your home today.

Specifications

Place of Origin China
Main Color Orange
Main Material Chenille
Filler Foam
Product Style American Design,Casual,Chinese
Use Case Bedroom
Arm Style Flared Arms
Back Style Pillow Back
Seats 2 Seat
Seat Plushness Medium-Soft

Dimensions & Weights

Assembled Length (in.) 66.90
Assembled Width (in.) 40.20
Assembled Height (in.) 25.60
Weight (lbs) 51.90

Product Features

  • Tai Chi Inspired Design: Two S-curved sofas combine to form a harmonious circle, embodying Yin-Yang balance while offering versatile solo or paired use.
  • Compressed & No Assembly: Unpack and decompress effortlessly
  • Luxurious Chenille Fabric: Woodgrain-textured chenille upholstery provides exceptional softness and durable elegance.
  • Space-Saving Solution: Compact 66.9' L profile fits small apartments, offices, and cafe corners without sacrificing style.
  • Includes Throw Pillows: Two coordinating pillows included for added lumbar support and aesthetic cohesion.
  • High-Resilience Foam: Engineered cushioning retains shape over time, offering balanced firmness and comfort

Description

Features
  • Harmonious Design: Two S-curved sofas create a balanced circular silhouette, providing versatile seating options for any modern living space.
  • Effortless Setup: The compressed packaging allows for simple, tool-free assembly by letting the sofa expand naturally after unpacking.
  • Luxurious Texture: Premium woodgrain-textured chenille fabric offers exceptional softness, durability, and a sophisticated aesthetic for your daily comfort.
  • Space-Saving Profile: The compact 66.9-inch length is perfect for small apartments, cozy home offices, or stylish cafe seating areas.
  • Coordinated Comfort: Two matching throw pillows are included to provide enhanced lumbar support and a polished, cohesive visual appeal.
  • High-Resilience Cushioning: Engineered foam core retains its shape over time, ensuring a perfect balance of firm support and lasting comfort.

Materials + Care

Materials:

  • Premium wood construction with durable finishes
  • High-quality upholstery fabrics designed for everyday use
  • Solid hardware and reinforced joinery

Care Instructions:

  • Dust regularly with a soft, dry cloth
  • Wipe spills immediately with a clean, damp cloth
  • Avoid harsh chemicals or abrasive cleaners
  • Keep furniture away from direct sunlight and heat sources to prevent fading
  • For upholstered pieces, vacuum regularly using upholstery attachment
  • Rotate cushions periodically for even wear

Maintenance Tips:

  • Tighten hardware occasionally to maintain stability
  • Use coasters and placemats to protect surfaces
  • Professional cleaning recommended for stubborn stains

With proper care, your furniture will maintain its beauty and function for years to come.

Shipping + Returns

Shipping:

  • Free shipping on all orders within the continental US
  • Delivery: 4-7 business days
  • Tracking information provided once order ships

Returns:

  • 14-day return window from delivery date
  • Items must be in original packaging with no missing parts or tools
  • Free return shipping - we'll send you a prepaid label
  • No restocking fee
  • Final sale items cannot be returned
  • Damaged or defective items: contact us immediately at support@groovyboardz.com
  • Refunds processed within 10 business days after inspection

To start a return, login to your account, go to Orders, and click 'Request Return' or email support@groovyboardz.com

Product FAQs

How long does assembly take?

Most pieces require minimal assembly and can be set up in 15-30 minutes with basic tools. Detailed instructions are included with every order.

What are the dimensions?

Please refer to the product specifications section above for exact measurements including height, width, depth, and weight capacity.

Will this fit through my door?

Yes! All furniture ships flat-packed in boxes (sometimes multiple boxes for larger items), so it will easily fit through standard doorways and hallways. You'll assemble the piece in the room where you want it, eliminating any concerns about maneuvering fully assembled furniture through tight spaces.

Can I see this in person?

We're an online-only store, but we offer a 14-day return policy so you can try it risk-free in your home.

Do you offer assembly services?

Assembly services are not currently available, but our furniture is designed for easy setup with clear instructions.

What if the item arrives damaged?

Contact us immediately at support@groovyboardz.com with photos. We'll arrange a replacement or refund right away.

Sustainability

Sustainable Materials

  • Quality furniture built to last for generations, not seasons
  • Responsibly sourced wood and materials
  • Durable construction reduces waste and replacement needs

Thoughtful Packaging

  • Minimal packaging using recyclable materials
  • Efficient shipping to reduce carbon footprint
  • Reusable packaging components when possible

Timeless Design

  • Classic mid-century modern aesthetic that never goes out of style
  • Investment pieces designed for longevity
  • Reduces the cycle of disposable furniture

Our Commitment

We believe in creating beautiful, functional furniture that respects both craftsmanship and the environment. Every piece is selected with durability and timeless appeal in mind.

Complete the Look

Buy Now, Pay Later with Klarna or Afterpay

You might also like...

Shop by Collection

Shop by Room

Bedroom
Bedroom.

Bedroom

Dining Room
Dining Room.

Dining Room

Living Room
Living Room.

Living Room

Office
Office.

Office

Bathroom Remodel + Fixtures
Bathroom Remodel + Fixtures.

Bathroom Remodel + Fixtures

Buy Now, Pay Later

Pay-in-4 interest free bi-weekly payments

Domestic Free + Fast Shipping

To the U.S. on all orders of $100 or more

Easy, Simple Returns

Hassle-free 14 day return window

Expert Customer Service 24/7

Call, chat, or text

In Stock + Ready to Ship

Ships within 24 hours

Intentional design

We create with intention. Our products solve real problems with clean design and honest materials.

Quality first

We obsess over the details and strive to deliver the best products at the best prices, every time.

Customer care

We're always on your side: keeping our loyal customers happy is our top priority and number one goal.